Saturday, May 2, 2020

Oriental, NC

The guys got a lot done on the electric supply -  they greased-up and pulled the main feed line thru conduit under the dock.



Was quite the ordeal - you can see just a bit of Duane's legs on the floating pontoon.  Ed's the one laying on the dock.  A good team.



Panel under construction.


And the finished panel!




Now we have full power on both sides of the dock.  Yeah!!!  And now I can run two air conditioners, the water heater, the microwave and the washer dryer all at the same time (if I was so inclined...)




And Cathy and I were also busy with laundry.  Cathy had dinner ready when the guys finally got showered and relaxed.  A yummy taco casserole.  I had made a Paula Dean peach cobbler.    We played Hearts for the first time - Cathy won the first game and Duane the second one.   Tomorrow is trencher day - we'll rent a Ditch-Witch from the local garden center to bury the electric cable back to the power panel.


1 comment:

  1. Hey K,
    It's always so satisfying to complete a project like that...
    Love,
    T

    ReplyDelete