Just lots of work on the deck.....
Moving over to the "door to nowhere" - Duane removed the siding and installed the support boards for the new deck.
All finished and trimmed out.
And next we moved over to the existing deck. Duane has always thought the 10' deep deck was too "bouncy" - so we are putting in re-inforcing beams made from a sandwich of three 2X12" X 16 foot boards. Very heavy!! More tomorrow.
Subscribe to:
Post Comments (Atom)
It will really be different to be able to walk out that door...
ReplyDeleteLove,
T