Forgot to post about this the other day....we had ordered some heavy acrylic sheeting (3/8" thick plexiglass) to replace all the salon windows on the boats. Both boats have issues and it's best just to get them all replaced.
The supplier is Piedmont Plastics near the RDU airport. The sheets are 4'x8' and very heavy. Since we needed them in smaller pieces, we had them cut them up into 4 pieces each.
Loading into the van. Duane will take these and rig them to bend since the windows are not completely flat installed on the boat.
Cutting out the patterns we made the other day at the boat. That's as far as we've gotten....
No comments:
Post a Comment